Airbus Plans Aircraft Wing Design Investment
December 22, 2014The European aerospace manufacturer Airbus has announced a £100 million ($156 million) investment in research into the next generation of wing design and manufacture in Wales and the southwest of England, following a funding deal with the government and the Welsh Assembly.
Wings for the group’s aircraft are designed at its Filton site near Bristol, while much wing assembly work is carried out at its Broughton plant in Flintshire. Airbus employs about 6,000 people at Broughton and around 4,000 at Filton.
Just under half of the £100 million will be invested in Broughton to build a new high-tech production line for A320 and A321 wings. This should be operational by July 2016.
More Resources